Inverter building using Wiseguys Power board and the Nano drive board


Author Message
wiseguy

Guru

Joined: 21/06/2018
Location: Australia
Posts: 1297
Posted: 04:34am 01 May 2026      

With the wiseguy system you dont have to be there to toggle switches. If for instance the inverter shuts down due to low battery (not enough solar etc), the inverter will resume in the correct fashion with auto precharge etc automatically when solar/generator charges the batteries again. You can be away for a week and this can all happen in the background without user intervention.

I have no problem with pre-charge switches etc but an on off switch is also easy to implement and you can't accidentally have a splat event.